
PT Dredolf Indonesia signed a contract for PLTD operation and maintenance work for the Village Electricity Unit (ULD) with PT. PLN (Persero) UID KALSELTENG. Under PT. PLN (Persero) UP3 Kotabaru, the unit is divided into 10 points. The project started running on April 1, 2023.